GAP Base
Base selection, cultivation standards, field management, and harvest processing.
Production Regions & Bases
Suitable regions differ by species: Scutellaria baicalensis is concentrated in Shaanxi, Shanxi, and Gansu; Dioscorea zingiberensis (Zingiber yam) is mainly from Hanzhong and Ankang in Shaanxi; Jerusalem artichoke is mostly grown in southern Shaanxi and Ningxia. Bases are selected by altitude, soil, water source, and rotation conditions, with multiple bases kept per species as backups to avoid supply disruption from a single-point event.
- Each base has an ID and plot map, with area, previous crop, and rotation cycle recorded separately.
- Soil and irrigation water are tested on a schedule, covering heavy metals and pesticide residues.
- The distance between base and factory affects post-harvest drying time, which is considered during site selection.
Field Management
Seed and seedling sources are supplied centrally to prevent mixed planting and harvesting of different species; fertilizers and pesticides follow an approved list, with prohibited items explicitly excluded, and every application is logged with product, dose, date, and pre-harvest interval.
Harvest timing is not set by calendar but determined by sampling assay trends—the optimal harvest window for the same plot may shift by one to two weeks between years.
- Critical control points: seed and seedling source, inputs, harvest timing, and primary processing (drying temperature and endpoint moisture).
- After harvest, material enters drying as soon as possible to avoid heat buildup from pile-up that causes mold and assay loss.
Traceability & Testing
Each raw-material batch is mapped one-to-one from base ID, plot, and harvest date to primary-processing lot, so finished products can be traced back to plot and harvest lot; test data for the same raw batch and the finished-product COA use the same specifications.
Incoming raw materials are tested for pesticide residues, heavy metals, moisture, and assay; non-conforming batches are returned and never enter production. Certificate of origin or on-site base visits can be arranged per batch.